Views: 21 Author: Site Editor Publish Time: 2016-11-30 Origin: Site
Recently, XCMG XR360 rotary drilling rig stationed in the liberation of South Technology Square, Metro Line booster Xuzhou first pile. XR360 rotary drilling rig equipped with intelligent control system with independent intellectual property rights, power head has a normal mode and into the rock mode, respectively, for soil and rock work, improve the efficiency of construction. Currently, the first pile test drilling has been successful.
Xuzhou Rail Transit Line 3 is a north-south backbone line, engineering line length of 18km, are off the assembly line, planned December 2020 opening of trial operation. I believe XCMG Rotary Drilling Rig will showcase exciting new home in subway construction.
Home | Products | Crane Parts | News | Serivce | About Us | Contact Us | Sitemap