scene one

XGC800 crawler crane challenge 120 m wind power hoisting

XGC800 crawler crane.png 

Condition: over the work of the main arm 126m + wind power arm 12m

Construction site: Anhui Province● Lingbi city wind farm

Fan type: 2.2MW

Cabin center installation height: 120m

Maximum lifting parts: nacelle weight 102t

 

 

Scene two

XGC16000 crawler cranes into the field of 5.0MW large wind power lifting

XCMG 1000 ton crawler crane XGC16000.png 

Condition: over the work of the main arm 78m + tower arm 42m

Construction site: Hebei Province● Zhangjiakou city wind farm

Fan type: 5.0MW

Cabin center installation height: 108m

 

Scene three

XGC16000 crawler crane challenge 140 m wind power hoisting

XCMG 1200 ton crawler crane XGC16000.png 

Condition: over the work of the main arm 96m + tower arm 66m

Construction site: Henan Province● Lankao city wind farm

Fan type: 2.2MW

Cabin center installation height: 140m

 

Scene four

XGC28000 crawler cranes into the field of offshore wind power lifting

XCMG 2000 ton crawler crane XGC28000.png 

Condition: over the main arm 108m

Construction site: Jiangsu Province● Dongtai city sea wind farm

Fan type: 4.0MW

Cabin center installation height: 96m

Maximum lifting parts: the cabin heavy 225t