XCMG new production: double boom tower crane XGT2T120

Views: 116     Author: Lisa     Publish Time: 2016-08-19      Origin: XCMG

Recently, the State Grid project construction site, a XGT2T120 XCMG tower crane double flat arm electricity pole high development arms to the pride of majestic stance atop the Central Plains, marking XCMG tower crane products sector to adapt to the adjustment of product structure market the preliminary results for the product after entering the national grid of UHV construction field and laid a solid foundation.

XCMG double boom tower crane XGT2T120 (1)

The two-level power pole with two arm boom and two complete lifting system can achieve arms sync, double the efficiency, the types of products, with its superior performance, safe and convenient construction characteristics, gradually replaced traditional pole, pole within the suspension and other construction equipment.

XCMG double boom tower crane XGT2T120 (2)

R & D double change arm tower crane, mastered the core technology of electric power pole, an electrical pole with a built set of technologies, provides for national power construction sets of solutions to achieve a special high-voltage tower construction with power pole series improve the product. The device has two jib and two complete lifting system can achieve arms sync, double the efficiency, the types of products, with its superior performance, safe and convenient construction characteristics, in particular high-voltage power transmission tower erected aspects widely used, and will gradually replace the traditional pole, pole within the suspension holding construction equipment, etc., become the national grid "three vertical and three horizontal one ring UHV transmission project" construction of major projects in the mainstream construction products.

Copyright © 2015 Xuzhou Yamar Equipment Co., Ltd. All Rights Reserved.      Designed by Leadong.com